Erection Sequence

Above you can see our amazing Roof Lifting System.

This 1650m2 (54 x 30m) section of roof was fully assembled and roofed on the ground.

4 Cranes lifted the assembled structure in just under 2 hours.

This process is conducted by an accredited and highly experienced third party installation company. We work with numerous third-party subcontractors who erect steel sheds full time throughout Australia.

Our recommended installers can work directly with you. They will:

  • Mark out the site.
  • Cast the hold down bolts into the peers.
  • Stand the structure.
  • Clad the shed.
  • Install everything we supply including mezzanine floors, roller doors, crane rails, insulation, windows and more. 
  • If you want a project managed solution, we can work directly with the installer to organise your shed erection. Contact us today.